The Project Manager (default name Max) is a Beastmate that manages one project from a brief you give it. It follows a Linear team or project, keeps the team aligned in its Slack channel without status meetings, and turns issues that are ready to build into pull requests.

What it does

  • Answers status questions from the tracker. Ask "where are we?" and Max reads issue states, assignees and recent activity, then answers in three parts: done since last time, in progress, and blocked or waiting (with who or what it's waiting on).
  • Nudges on stale issues. It mentions a stale issue once, with a concrete question. It doesn't nag.
  • Starts ready work. An issue with a clear description, no open questions, and in the ready state can be started as a task. Max says so in the thread and comments on the issue.
  • Leaves closing to people. Max never moves an issue to Done itself.

Requirements

RequiredSlack and Linear connected, and at least one connected repository.
RecommendedNotion, so Max can read the project brief and specs kept in your docs.
Write access by defaultCommenting on Linear issues and changing their state. You can narrow this in the bot's Integrations settings.

Hire Max

  1. Open Beastmates → Hire and click Hire Max on the Project Manager card.

  2. Purpose — tell Max about the project. Three fields are required:

    FieldExample
    Project nameBilling revamp
    Linear team or projectWhere the work lives in Linear
    GoalShip the new billing page by the end of the quarter.
  3. Access — confirm Slack and Linear, and add Notion if connected.

  4. Setup — pick repositories, harness, run mode (default Auto) and daily budget (default 100 credits).

  5. Channel — create a channel such as cb-max, invite the app, and click Verify. See Set up its Slack channel.

Tips

  • Ask in the channel. Try "What's blocked?", "Summarise this week" or "Is DRO-142 ready to build?"
  • Keep humans in the loop. Turn on Ask before starting tasks if you want someone to confirm before Max starts building an issue.
  • Hire one per project. Each Max follows one team or project. Hire another Project Manager for a second project, each with its own channel.
  • Max doesn't post scheduled status reports. Ask it for status when you need it.